How Do I Set Up a Party Keg Pump

Step 1 – Simply place the keg into a large bin or tub at least 2-3 hours before your looking to use it.

Step 2 – Pour cold water and ice cubes into the tub/bin until its almost full. Be sure to have it in the shade or the coolest place available, basically avoid direct sunlight. Leave to cool until you feel the need to start pouring the beer.

Step 3 – Attach the Hand Beer Pump to the keg securely – DO NOT PUMP AIR YET!

Step 4 – The hand pump will automatically raise as the keg is already pressured and so beer can easily be poured from the tap without pumping air.

Step 5 – Tilt the glass on an angle and begin to pour your cold beer using the tap at the top of the Hand Beer Pump.

 Additional tips on pouring the perfect pint are available for the Keg Hire Team.